The works are nearly finished
Prepare the drains for handover.
Before a building is handed over, or at the end of a renovation, we agree with the site manager which sections need cleaning and which checks should be documented.

On site
Cleaning the agreed sections
Starting at the accessible chambers, we examine the reported deposits and select a cleaning method for the pipework. If an obstruction prevents further access, we identify the section that still needs checking.
A camera inspection can follow the cleaning. Depending on the brief, the site manager receives images, findings and any limitations affecting the accessible sections.
Explore camera inspectionsGetting in touch
Before the site visit
- Any available drainage plan and access chambers.
- The sections to be cleaned, the reported residues and the current stage of the works.
- The target handover date, the site contact and the documents required.